Aperçu
Poste de lavage lourd et fermé pour le site minier de Macheng de Shougang à Luannan, dimensionné pour la circulation de camions miniers très chargés.
Contexte client
The Shougang Macheng iron mine is a super-large filling-method underground mine under construction, with a combined mining-and-processing capacity of 22 million t/a (15 million t/a in the upper district and 7 million t/a in the lower district, mined simultaneously). The wash station was procured mainly for heavy vehicles entering and leaving the plant via No. 2 auxiliary shaft, and is installed on the No. 2 auxiliary shaft industrial site, at the inner-side exit of the No. 2 auxiliary shaft gate. KAMRON was responsible for design, fabrication, installation, commissioning and trial operation until the equipment ran normally.
Le défi
- Camions miniers très lourds sur site minier.
- Environnement poussiéreux et boueux.
- Poste fermé pour la réduction des émissions.
- Solutions pour carrière isolée.
La solution
Poste de lavage lourd et fermé pour le site minier de Macheng, dimensionné pour la circulation minière.
Détails du projet
- Réservé aux very lourds miniers.
- Poste fermé anti-poussière.
- Construction pour carrière.
- Lavage complet châssis et caisse.
For a super-large mine, a wash station is not merely an environmental facility but an enforced exit checkpoint. Only by integrating equipment, enclosure, barrier and monitoring into one system can washing performance be guaranteed without hurting plant traffic efficiency under heavy traffic, heavy vehicles and tight schedules.
Galerie